Thursday, December 8, 2022

This 90-ton excavator breaks up 26,000 cubic meters of concrete

by admin
0 comment

Runway 28 at Zurich Airport needs to be renewed. The surface is renovated in stages in 70 to 80 night shifts. Construction machine operator Tobias Klay rips out the concrete slabs practically in one piece with so-called cake shovels before they are then shredded.

Related News

Latest Switzerland News and updates and political news, follow our daily update about the congress and the government roundup, we also provide the latest news from all over the world minute by minute, subscribe to get the latest updates directly to your inbox.

© 2022 All Right Reserved. Switzerland Times