Close Menu
  • Home
  • Politics
  • Business & Economy
  • Education
  • Environment
  • Immigration
  • Technology
  • Automotive
  • Things To Do
  • More
    • Web Stories
    • Global
    • Press Release
What's On

Swiss Green Liberals target fuel-tax break for piste groomers

9 January 2026

Swiss town marks its move from Bern to Jura

2 January 2026

Switzerland’s last commuter paper prints its final edition

26 December 2025

Swiss People’s Party seeks tougher language rules for citizenship

26 December 2025

Swiss to vote on accession to UN nuclear-ban treaty

25 December 2025
Facebook X (Twitter) Instagram
Web Stories
Switzerland Times
  • Home
  • Politics
  • Business & Economy
  • Education
  • Environment
  • Immigration
  • Technology
  • Automotive
  • Things To Do
  • More
    • Web Stories
    • Global
    • Press Release
Home » Gotthard tunnel queues reach 15 kilometres
Automotive

Gotthard tunnel queues reach 15 kilometres

By switzerlandtimes.ch5 December 20232 Mins Read
Gotthard tunnel queues reach 15 kilometres
Share
Facebook Twitter LinkedIn Pinterest Email

Switzerland’s Gotthard tunnel is a key link between northern and southern Switzerland. During the summer holiday season it becomes a major traffic choke point. On Sunday 16 July 2023, traffic queues north of the tunnel stretched as far as 15 kilometres, according to SRF. The waiting time to get to the tunnel was as long as two and a half hours according to the TCS traffic service.

Queues and waiting times were not as long on the southern side. There, the queue reached 5 kilometres with waiting times as long as 50 minutes.

The Gotthard Road Tunnel runs between Göschenen in the canton of Uri (north) and Airolo in the canton of Ticino (south). At 16.9 kilometres in length it was the longest road tunnel in the world when it was built in 1980. It is currently the fifth-longest. The tunnel consists of only one bidirectional tube with one lane in each direction. It is reached on both sides by a motorway with two lanes running in each direction. When driving at the maximum allowed speed of 80km/h, the journey through the tunnel takes around 13 minutes.

There have been discussions on the idea of charging tolls to use the tunnel. The idea has been political resistance. In any case charging a toll will not increase the tunnel’s capacity.

More on this:
SRF article (in German)

For more stories like this on Switzerland follow us on Facebook and Twitter.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Criminal network in France responsible for dozens of thefts in Switzerland dismantled

Swiss car insurance: premiums set to rise again in 2026

Gotthard Pass to close on Friday

Swiss road deaths rise as Europe’s fall

Switzerland plans to slow more motorways to 80km/h

Swiss opposed to blanket 30 km/h zones in urban areas

Swiss government rejects call to double price of the motorway vignette

Over 600,000 vehicles on Swiss roads beyond testing deadline

Rockfall risk keeps the Grand-Saint-Bernard route closed

Editors Picks

Swiss Green Liberals target fuel-tax break for piste groomers

9 January 2026

Swiss town marks its move from Bern to Jura

2 January 2026

Switzerland’s last commuter paper prints its final edition

26 December 2025

Swiss People’s Party seeks tougher language rules for citizenship

26 December 2025
Latest Posts

Swiss Green Liberals target fuel-tax break for piste groomers

9 January 2026

Swiss town marks its move from Bern to Jura

2 January 2026

Switzerland’s last commuter paper prints its final edition

26 December 2025
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Switzerland Times. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.